![]() |
Key Start The key start control panel includes all the instrumentation and protection that is required in circumstances where the generator can be started manually and the load is applied manually. Complete details and a listing of all the available components are shown on the Forest City specification data sheet. Autostart with or without automatic transfer switch The autostart panel utilises an electronic module that will enable the generator to start automatically and then shutdown automatically on receipt of a remote signal. Timing is adjustable for: delay on start An optional automatic transfer switch can be provided either in the autostart panel or in a separate panel for remote mounting. The customers may prefer to provide their own transfer switch. The length of control cabling and expensive power cabling can be minimised if the autostart panel is fitted to the generator and the transfer switch is located close to the mains power supply. Complete details and a listing of all the available components are shown on the Forest City specification data sheet. Automatic Dual Mutual Standby The Dual Mutual Standby and Automatic Mains Failure system is designed to constantly monitor the mains supply, and upon full or partial mains failure, automatically start one generator and supply the load until such time that the mains achieves full restoration. Upon restoration, the control system will change back to Mains On Load, running the generator Off-Load for a cool down period, before coming to rest. Upon the next occurrence of a mains failure, the control system will automatically switch over to the second generator to start and supply the load. On each subsequent occurrence of mains failure, the generators will be utilised on a rotational basis. The system can be supplied in a modified form for situations in which there is no mains power supply. Complete details and a listing of all the components are available on request. Automatic Synchronise - Automatic Load Share to Mains Failure Control System The Automatic Start - Automatic Synchronising Control Panel is designed for automatic starting of two or more generating sets. Upon successful start, the generators will share the load output equally, until such time that the remote start signal is removed. During running, should the Load Demand decrease below a preset level, the generator that is at that time the Non-Duty set will cease to run, with all load being supplied from the duty set. Should the Duty Set shutdown due to any fault that occurs during single running operation, the Non-Duty generator will automatically start and supply the load output. The Control Panel will consist of: 1 x Control Cubicle for each generator 1 x Load Transfer Section The system can be supplied in a modified form for situations in which there is no mains power supply. Full details of typical designs together with a list of all the components can be provided on request. As an alternative, we can design a system to meet a customers requirements. |
|||
![]() |
||||
![]() |
||||
![]() |
||||
|
||||